Construction report

date: 11.08.10

Distribution board


Schritt 1


The idea: All connections of the IO Master Card will be forwarded to our distribution board. There they are grouped so that every panel has its own group of in- and outputs. The panels will be connected to the groups on the board via cables with D-Sub connectors (DB-25, DE-9, DE-15F).

Schritt 2


We mill holes into the acrylic glass for the D-Sub connectors.





Schritt 3


Cut-out for a 25-pin D-Sub connector.






Schritt 4


All holes are drilled and/or milled. Unfortunately we broke the board (in the upper right corner). But we fixed the problem by using another acrylic glass to stabilize the glass.


Schritt 5


Afterwards we assembled all D-Subs and the two breadboards. These were added to take the 40-pin connectors for the connection to the Master Card.



Schritt 6


The first connections have been soldered ... and there are more to come.





Schritt 7


...it's not getting less work...






Schritt 8


The first milestone was reached:
All Inputs were soldered.





Schritt 9


The first tests were satisfying.






Schritt 10


Now all connections for the Outputs (no 7-segement-Displays) are finished.

...additional pictures follow.


...back to overview